3. The only thing is that the Waikiki Beach reclamation project (huge trucks transferring up and down the beach dumping sand to re-fill out the beach), starts daily from 7 am until about 2 pm Mon-Thurs, so the sound of the trucks may be heard on the lower floors -- we were OK, but I could faintly hear them on the 17th floor.