Back to search results
OpinionWell
Rank
23rd
Out of 197

Sheraton Boston

Average Price: $339  
 
Hotel Class:
39 Dalton Street
Boston, 02199 View map  
3-Star Hotel Rank: 4 of 37
Average review rating: 3.61
OpinionWell Value Index: 6
Traveler reviews analyzed: BedBugRegistry (3) , Expedia (80) , MyTravelGuide (990) , Travelocity (36) , TripAdvisor (1113) , YahooTravel (23)
SAFE TO BOOK ? (3/5 issues found)
Skip Navigation Links
Keyword Cloud
The hotel review keyword cloud displays the words commonly used to describe the features and services of this hotel. Select a word and explore.
Construction
Appears in 24 comments. 
The following words were used in comments with Construction:
noise (6)   poor (2)   public (2)   reception (2)    
Users can vote for helpful comments, which are saved in the Most helpful section.
Sort by:
See all
1. The construction is finished, and I usually get a room in the North Tower.
"A solid performer in all categories " Read full review on TripAdvisor   12/14/2011 Vote      
2. FYI - If you are travelling inbound from B, C, or D, Copley Station is under construction so you will not be able to change to the E train there, continue to Arlington, then cross over to outbound.
"Great hotel, great location " Read full review on TripAdvisor   1/3/2010 Vote      
3. The construction.
Read full review on MyTravelGuide   8/12/2009 Vote      
4. The north tower is still under construction.
Read full review on MyTravelGuide   7/13/2009 Vote      
5. The north tower is still under construction.
Read full review on MyTravelGuide   7/13/2009 Vote      
6. At 6:45am the next day, the construction started.
Read full review on MyTravelGuide   7/7/2009 Vote      
7. construction going on; thin walls.
Read full review on MyTravelGuide   7/7/2009 Vote      
8. We were aware of the construction on the very upper floors of the North Tower (floors 25 and above, but were assured that our room on 19th floor would not be affected at all).
Read full review on MyTravelGuide   7/7/2009 Vote      
9. We were aware of the construction on the very upper floors of the North Tower (floors 25 and above, but were assured that our room on 19th floor would not be affected at all).
Read full review on MyTravelGuide   7/7/2009 Vote      
10. At 6:45am the next day, the construction started.
Read full review on MyTravelGuide   7/7/2009 Vote      
   
About Us | Terms of Use | Privacy Policy | Site Map
© 2010 OpinionWell, LLC, All Rights Reserved